Noida Metro Aqua Line to run trains more often at peak hours from 1 November
Peak-hour waits on the Aqua Line are set to shorten after a record day of ridership, and the metro operator says the change will add capacity.

Key points
- The Aqua Line carried a record 1,05,358 passengers on 23 October 2026.
- From 1 November 2026, the peak-hour gap between trains falls from 7 minutes 30 seconds to 6 minutes 35 seconds.
- A late-night service with a last train at 11.25 pm from Sector 51 is under consideration, with no start date.
- NMRC says daily ridership rose 20 per cent; no extra train count has been announced.
On 23 October 2026, the Noida Metro Aqua Line carried 1,05,358 passengers in a single day, the highest daily ridership recorded on the line since the Noida Metro Rail Corporation (NMRC) began operations. In a statement dated 24 October 2026, the corporation said it will cut the peak-hour gap between trains from 7 minutes 30 seconds to 6 minutes 35 seconds from 1 November 2026.
What changes from 1 November
NMRC called the change a planned operational change to raise carrying capacity when demand is highest. The cut is 55 seconds for each peak interval. The statement does not say how many additional train services will run under the revised frequency.
At present, the Aqua Line runs trains every 7.5 minutes during weekday peak hours and every 15 minutes off-peak. Saturdays run every 10 minutes through the day and Sundays every 15 minutes. The corridor has 13 trains in operation with one kept in reserve, and each train can carry up to 1,322 passengers.
Late-night service under consideration
NMRC is also considering later services. Under the proposal, the last train from Sector 51 towards Depot Station would leave at 11.25 pm. Today the first train starts at 6 am, and the last train from Noida leaves at 10 pm.
The change depends on finishing the necessary arrangements and an assessment of operational feasibility. No start date has been set. Commuters should not treat 11.25 pm as the confirmed last departure until NMRC announces it.
Ridership and the line's record days
NMRC said average daily ridership has risen 20 per cent, which it linked to several passenger-service initiatives. These include QR-code-based ticketing, the National Common Mobility Card (NCMC) and better connections through a foot overbridge. The corporation said it is also consulting stakeholders on last-mile connectivity for metro commuters.
The line first crossed 50,000 daily riders on 17 October 2022, when it recorded 50,231 passengers. The 23 October 2026 figure is the highest since NMRC began operations.
The line connects to the Delhi Metro Blue Line at Sector 52 through a pedestrian walkway, so passengers still exit one system before boarding the other.
Extensions in planning and approved
The Greater Noida Industrial Development Authority (GNIDA) approved a Phase 2 extension of the Aqua Line on 4 December 2018. The 15 km extension would link Noida Sector 71 with Knowledge Park 5 in Greater Noida, with nine stations and an estimated cost of ₹2,602 crore. No completion date has been announced.
Three further corridors are under planning: a 2.6 km Depot-Boraki stretch, an 11.56 km Botanical Garden to Sector 142 stretch, and an 8.4 km stretch from Sector 51 to Greater Noida West Sector 4. No dates have been given for any of them.
What it means for commuters and buyers
For daily riders, the immediate change is shorter waits at peak hours. The change alters how often trains run on the existing 29.7 km elevated route. It does not add stations. NMRC's statement says nothing about property prices, rentals or investor returns, so buyers along the corridor should judge the change on travel time, not on price expectations.
The next steps are the start of the revised peak frequency on 1 November 2026, and a decision on the late-night timetable. Commuters should watch for NMRC's announcement on the extra train count and the final late-night timings.
Spotted an error? Tell our editors · Corrections policy